Contractor Management & Construction Supervision in Jamaica

Jamaica’s construction environment is governed by the Building Act, 2018 and the National Building Code of Jamaica, which adapts the 2018 International Codes to local conditions (hurricane winds, coastal exposure, seismic risk). Duke Sterling’s supervision framework keeps your project aligned with Jamaican law, permits, and best practice from concept to handover.

Why choose us

Jamaica-ready designs

We design to the National Building Code of Jamaica (NBCJ)—customized from the 2018 International Codes—and current local bylaws, so your plans meet code from day one.

Approvals support

We package and submit drawings that match Municipal Corporation requirements and, where applicable, manage referrals (NEPA, NWA, Fire Brigade, MOH, NWC, ODPEM).

3D & BIM clarity

Photorealistic 3D views and model-based coordination reduce redesign, RFIs, and site clashes.

What we do

Our supervision method

FAQs

Frequently Asked Questions

Not always. NEPA permits/licences apply to prescribed categories (e.g., coastal, rivers/streams, certain industrial/commercial works). We screen your scope against NEPA’s checklist and handle applications when required.
Municipal bodies issue building approvals under the Building Act/Code; NEPA handles environmental permits/licences where activities meet prescribed thresholds. Some projects need both.
For Government of Jamaica projects over set thresholds, yes—PPC registration (formerly NCC), correct category/grade, and a valid TCC are mandatory. For private projects, PPC isn’t legally required but is a strong quality filter we recommend.
The Jamaica Building Code (customised from the 2018 I-Codes), including chapters for structural, fire, mechanical, electrical, and existing buildings where applicable.
We enforce wind-load design/anchorage, water-shedding, robust roof details, and coastal corrosion countermeasures (cover, coatings, stainless hardware where needed) per code and manufacturer data.
Yes. We perform a rapid audit (schedule, quality, compliance), stabilise critical path activities, close non-conformances, and renegotiate sequencing or resources where necessary—documented through instructions and revised look-aheads.
We require priced change proposals with scope, programme, and cost impact; validate quantities; and only issue instructions once approved—keeping a clean VO register tied to your budget.
Yes. Our valuations align with measured progress, test results, and accepted work. We don’t certify concealed work without evidence and sign-offs.
We require contractor HSE plans, method statements, inductions, and toolbox talks; we audit daily and stop unsafe work. Environmental controls follow NEPA guidelines where relevant.
As-built drawings, O&M manuals, commissioning records, warranties, defect lists/closure logs, and a final account reconciliation ready for occupancy approvals.